- 资源介绍
- 更新记录
- 安装教程
若有个人部署运行问题,点击右侧客服按钮咨询站长
站长联系方式
QQ:3484724101
摘 要
本次设计完成了35kV富蕴八钢球厂降压变电站电气部分设计的总过程,设计过程中遵循国家的法律、法规,按照国家标准及规范,明确设计的目的,根据本厂用电负荷,并适当考虑生产的发展,按安全可靠,技术先进,经济合理的要求,确定35kV富蕴八钢球厂变电所的位置与型式,通过负荷计算,确定主变压器台数及数量,进行短路电流计算,选择变电所的主接线及高、低压电气设备,选择配置继电保护装置,最后按要求完成毕业设计,并绘出设计图纸。本次设计建设一座35kV降压变电站,首先,根据主接线的经济可靠、运行灵活的要求选择各个电压等级的接线方式,在技术方面和经济方面进行比较,选取灵活的最优接线方式并以CAD辅助设计软件绘制它接线图。其次进行短路电流计算,根据各短路点计算出各点短路稳态电流和短路冲击电流,从三相短路计算中得到当短路发生在各电压等级的工作母线时,其短路稳态电流和冲击电流的值。最后,根据各电压等级的额定电压和最大持续工作电流进行设备选择,然后进行校验并计算出系统负荷以及短路电流的数据用来选择供电设备,并且注意系统的接地、防雷以及常见故障的排除等。
关键词:35kv;化纤厂;降压;变电站;电气主接线
ABSTRACT
This design has completed the general process of the design of the electrical part of the step-down substation of 35kV Fuyun eight Steel Ball Plant. In the design process, it follows the national laws and regulations, defines the purpose of the design in accordance with the national standards and norms, and according to the power load of the factory. Considering the development of production properly, according to the requirements of safety, reliability, advanced technology and economical and reasonable, the position and type of substation in 35kV Fuyun eight Steel Ball Plant are determined, and the number and number of main transformer stations are determined by load calculation, and the short circuit current is calculated. Select the main wiring and high and low voltage electrical equipment of the substation, choose to configure the relay protection device, and finally complete the graduation design according to the requirements, and Draw out the design drawings. This design and construction of a 35kV step-down substation, first of all, according to the economic reliability of the main connection, flexible operation requirements to select the connection mode of each voltage level, in technical and economic aspects to compare, The flexible optimal wiring mode is selected and the wiring diagram is drawn by CAD software. Secondly, the short-circuit current is calculated, the short-circuit steady-state current and the short-circuit impulse current are calculated according to each short-circuit point. From the calculation of the three-phase short-circuit, when the short-circuit occurs in the working bus of each voltage level, it is obtained. The value of short circuit steady current and impulse current. Finally, according to the rated voltage and maximum voltage of each voltage grade The system load and short circuit current data are calculated to select the power supply equipment, and attention is paid to the grounding, lightning protection and the elimination of common faults of the system, etc. The equipment is selected with large continuous working current, and then the data of the system load and short circuit current is calculated.
Key words: 35kV; chemical fiber factory; step-down; substation; electric main wiring
目录
第五章 35kV富蕴八钢球厂总降压变电所及接入系统设计 19
5.1 35kV富蕴八钢球厂总降压变电所变压器台数及容量的选择 19
猜你喜欢
-
内蒙古海天公司企业网的规划与设计毕业论文+任务书+开题报告+拓扑图
2021-06-09 -
门座式起重机平衡系统设计毕业论文+cad图纸
2021-06-08 -
基于java网上服装店的设计与实现毕业论文+任务书+中期检查+答辩PPT+代码+数据库+演示视频
2021-06-09 -
吉利4G15发动机正时系统装配工艺 毕业设计论文
2021-06-08 -
分级输出四路带保护程控电源设计与实现毕业论文+任务书+开题报告+审题表+外文翻译及原文+答辩PPT+上下机位程序及PCB原理图
2021-06-08 -
江西理工大学本科毕业设计(论文)格式
2021-06-08 -
基于Hadoop的用户购买行为的商品推荐系统毕业论文+任务书+java项目源码
2021-06-10 -
手机APP订餐系统的设计与实现(论文+任务书+开题+中期+答辩+程序)
2021-06-10 -
基于JavaWeb的贫困认定管理系统设计与实现毕业论文+项目源码及数据库
2021-06-08 -
基于HTML5的家具网站的设计与开发毕业论文+开题报告+网站源码+查重报告
2021-06-08
-
基于单片机的二维高精度液晶显示电子指南针毕业论文+硬件电路+软件程序
2021-06-08 -
路面冰雪清除机除冰雪机械装置及电气设计说明书(论文)+开题报告+外文翻译及原文+cad图纸
2021-06-08 -
探测机器人系统的设计说明书(论文)+任务书+开题报告+翻译及原文+cad图纸+程序
2021-06-08 -
基于ASP.NET的企业进销存管理系统的设计和实现(APP+网页)毕业论文+项目源码
2021-06-08 -
云南大学滇池学院本科生毕业论文(设计)撰写规范
2021-06-09 -
重庆大学科技学院毕业论文撰写规范化要求说明
2021-06-08 -
衡南县网络优化及雁峰区volte分析报告(毕业论文)
2021-06-08 -
基于微信的智能家居控制系统的设计与实现(物联网毕业设计论文)
2021-06-08 -
毕业设计(论文)教学管理的规定
2021-06-10 -
基于单片机的自动停车收费系统完整论文
2021-06-10
猜你在找
99源码网 » 富蕴八钢球厂35kv降压变电所初步设计毕业论文+初稿+答辩PPT+设备表+CAD图纸
常见问题FAQ
- 免费下载或者VIP会员专享资源能否直接商用?
- 本站所有资源版权均属于原作者所有,这里所提供资源均只能用于参考学习用,请勿直接商用。若由于商用引起版权纠纷,一切责任均由使用者承担。更多说明请参考 VIP介绍。
- 提示下载完但解压或打开不了?
- 找不到素材资源介绍文章里的示例图片?
- 99源码网
- 2021-06-09Hi,初次和大家见面了,请多关照!